New Linkway
PROJECT NAME:
Construction of New Linkway from Block 12 Taman Ho Swee to Block 94 Havelock Road, Construction of New Linkway from Block 95 to 96 Havelock Road, Upgrading of Open space at Block 51 Chin Swee Road and Upgrading of Open space at Block 12 and 13 York Hill
PROJECT DURATION:
8 Months (Year: 2017-2018)
TYPE OF BUILDING:
New Linkway, Upgrading of Open Space
WORKS INVOLVED:
-
Building works (Excavation, Substructure, Superstructure Slab, Structural Roof trusses, Roofing Works, Floor Finishing, Painting, New Pavilion with roof tiles including ceiling & benches, Playground with new equipment, RC table & seats, EPDM flooring)
-
Electrical Installation – (Lighting, Power point, Lightning Protection system)